CSR & impact

School classroom renovation day

Teams repaint and refit classrooms, a library corner or a playground at a public school that needs it, on a weekend when pupils are away.

School classroom renovation day
One final price Quotes in 24 hours

Quick answer

What is School classroom renovation day and who is it for?

Teams repaint and refit classrooms, a library corner or a playground at a public school that needs it, on a weekend when pupils are away. Duration: 6 hours. Group size: 15–80 people. Setting: Indoor and outdoor. Price from €4,500 per group. Popular locations include Istanbul, Izmir, Ankara.

Last updated CSR & impact Get a quote

Duration
6 hours
Group size
15–80 people
Setting
Indoor and outdoor
Physical intensity
Medium intensity
Price from
€4,500 per group
Available in
Istanbul, Izmir, Ankara

We identify a public school, usually in a district or village where budgets are tight, through the local education directorate. A site visit a few weeks before fixes the scope: typically two to four classrooms, a library corner and murals in a corridor or the playground. All materials are bought in advance and permissions are arranged.

On the day, teams each take a room. Our site supervisor and a professional painter run a safety briefing and show how to prepare walls, use rollers and work on low step ladders. Teams paint, assemble bookshelves and desks, and paint simple designs on walls using stencils prepared with the teachers. Each team leader has to manage materials and time to finish the room before the end-of-day walkthrough.

The headteacher joins for the handover, and the school shares photos of pupils using the rooms when term starts. Pricing covers materials for a typical scope and can be adjusted to your budget.

Included

  • School selection and permissions via the education directorate
  • Paint, tools, furniture and protective gear
  • Site supervisor and professional painter
  • Stencils and mural designs
  • Lunch and drinks on site

Not included

  • Transfers to the school
  • Books and IT equipment (can be added)

Sustainability practices

  • Community impact

Accessibility

Most tasks can be done from floor level; school buildings vary, and we confirm step-free access during the site visit.

Ready to plan this?3 venue proposals in 1 business day

Get a quote